TECHNOLOGY

Global Technology Milestone With Installation Of Core Catcher At El-Dabaa NPP Unit 2

Global Technology Milestone

OpenLife Nigeria reports that Nuclear energy technology has hit a major milestone as specialists started to install the core catcher body at Unit 2 of El-Dabaa NPP in the Arab Republic of Egypt ahead of schedule.
The Rosatom State Corporation Engineering Division is the general designer and general contractor.

The official ceremony dedicated to the commencement of the core catcher installation was attended by Dr. Amged El-Wakeel, Board Chairman of Nuclear Power Plants Authority of the Arab Republic of Egypt (NPPA), Eng. Mohamed Ramadan, Deputy Board Chairman of NPPA, and Mr. Andrey Petrov, Rosatom State Corporation First Deputy General Director for Nuclear Energy – ASE JSC President.

Others include Mr. Alexey Zhukov, ASE JSC First Vice President for Construction, Mr. Alexey Kononenko, ASE JSC Vice President – Director for the El-Dabaa NPP Construction Project, as well as project teams of the Rosatom Engineering Division and the Nuclear Power Plants Authority of Egypt.

“Our project continues to develop rapidly. The installation of the core catcher at power unit two is one of the key construction milestones planned for 2024, which was completed ahead of schedule in November 2023.

It is worth mentioning that less than two months ago, namely in October, we installed a core catcher at power unit one which demonstrated almost simultaneous construction of the first and second power units.

By the end of this year, we plan the first concreting in the foundation slab of power unit four; therefore, it will spell the end of the preparatory period of and the transition to, the main stage of the four-unit El Dabaa NPP construction.

This is the result of the coordinated work of the Owner and the General Contractor’s united team”, said Andrey Petrov.

Dr. El-Wakeel expressed his appreciation to all the workers from the Egyptian and Russian sides, adding that “what the El-Dabaa Nuclear Power Plant site is witnessing today is not the result of coincidence, but rather the consequence of diligent and unrelenting efforts from all Project participants working day and night in order to reach the Project’s milestones.

“This could not have been achieved without determination, persistence and ceaseless diligent work.”

The core catcher consists of several elements whose total weight amounts to 700 tons.

In October 2023, the similar equipment was installed at power unit No. 1.

El-Dabaa NPP is the first nuclear power plant in Egypt which will be built in the city of El-Dabaa, Matrouh province, on the Mediterranean coast, approximately 300 km North-West of Cairo. The NPP will consist of four power units, 1200 MW each, with generation III+ VVER-1200 reactors (pressurized water reactors).

This is the newest generation technology which has references and is already operating successfully. There are four operational power units of this generation: two reactors at Novovoronezh NPP and two at Leningrad NPP. Outside Russia, one power unit of Belarus NPP with VVER-1200 reactor was connected to the grid in November 2020.

The NPP is being constructed in accordance with the package of contracts which entered into force on December 11, 2017.

In accordance with the contractual obligations, the Russian party will not only construct the power plant but will also supply nuclear fuel for the whole life cycle of the NPP and will provide assistance to the Egyptian partners in training of the personnel and support of operation and service of the plant during the first 10 years of its operation.

Under a separate agreement, the Russian party will build a special storage and will supply containers for storing spent nuclear fuel.

 

 

Share This
Openlife Reporter

Recent Posts

Boost In Oil Production: NNPC’s Utapate Crude Grade Hits Global Oil Market As OML 13 Asset Eyes 80,000 bpd By End Of 2025

Boost In Oil Production OpenLife Nigeria reports that in a major boost for Nigeria’s crude…

14 hours ago

Health, Insurance, Entrepreneurship Lectures To Take Centre Stage At NASRE’s End- Of-Year Supports To Journalists With Challenges

Health OpenLife Nigeria reports that the Nigerian Association of Social and Resourceful Editors (NASRE) has…

1 day ago

We Are Building A New Police Free Of Corruption But Full Of Vigor, Determination To Serve—Argungu

We Are Building A New Police OpenLife Nigeria reports that the Police Service Commission today,…

1 day ago

Helen Paul Receives Georgia Citizen Award

 Helen Paul Receives Georgia Citizen Award     Popular entertainer and educationist, Prof Helen Paul…

2 days ago

FirstBank Hosts Inaugural China-Africa Interbank Association Forum; reiterates its commitment to promoting trade, financial cooperation and Economic Development

FirstBank Hosts   OpenLife Nigeria reports that FirstBank, the premier West African financial institution and…

2 days ago

Zenith Bank Tech Fair 4.0 Holds November 21 @ Eko Hotels, Features Global IT Practitioners (How To Register & Participate)

Zenith Bank Tech Fair OpenLife Nigeria reports that the Fourth Edition of the Zenith Bank…

2 days ago

This website uses cookies.